November 10th- Construction Work Update

Ongoing Work:

  • Storm Sewer installation on the east side of Hunt Club Rd south of Washington St.
  • HMA base course widening on the north side of Washington St east of Hunt Club Rd and on the east side of Hunt Club Rd north of Washington St.
  • Ditch-line grading and infiltration area installation on the south side of Washington St east of White Oak Ln

Upcoming Work

  • HMA Patching on all legs of intersection.
  • Temporary modified urethane pavement markings on all legs of intersection.
  • Permanent landscaping on the north side of Washington St east of Hunt Club Rd & the east side of Hunt Club Rd north of Washington St.
  • Underground conduit installation for new traffic signal configuration at the intersection of Hunt Club Rd and Washington St.
  • Storm Sewer installation on north side of Washington St west of Hunt Club Rd.
Join our mailing list

Privacy Preference Center