June 22nd Construction Work Update

Ongoing Work

  • HMA surface removal of existing roadway along project limits in preparation for resurfacing.
  • Placement of HMA level binder along project limits following existing surface removal.
  • Pour concrete curb and gutter gaps outside project limits on Hunt Club Rd north of Washington St.

Upcoming Work

  • Permanent landscaping for Stage 2 and Stage 3 along project limits.
  • Install stamped concrete and gravel mulch in center medians on the Washington St east and west of Hunt Club Rd and on Hunt Club Rd north and south of Washington St.
  • Installation of permanent traffic signal posts and mast arms at the intersections of Hunt Club Rd and Washington St & Hunt Club Rd & Orchard Valley Dr.