June 8th Construction Work Update

Ongoing Work

  • Install stamped concrete and gravel mulch in center medians on the Washington St east and west of Hunt Club Rd north and south of Washington St.
  • Installation of permanent traffic signal posts and mast arms at the intersections of Hunt Club Rd and Washington St & Hunt Club Rd & Orchard Valley Dr.

Upcoming Work

  • Permanent landscaping for Stage 2 and Stage 3 along project limits.
  • HMA surface removal of existing roadway along project limits in preparation for resurfacing.
  • Placement of HMA level binder along project limits following existing surface removal