Ongoing Work:
- Topsoil respread/grading behind curbs on all legs of Hunt Club Rd and Washington St.
- Placing and compacting stone for bike path on the west side of Hunt Club Rd north of Washington St.
- Underground conduit installation for new traffic signal configuration at the intersections of Hunt Club Rd and Washington St & Hunt Club Rd and Orchard Valley Dr.
- Underground conduit and handhole installation for proposed interconnects on all legs of Hunt Club Rd and Washington St.
Upcoming Work
- Base course widening on the south side of Washington St west of Hunt Club Rd.
- HMA paving for bike path on the west side of Hunt Club Rd north of Washington St.
- HMA lateral patching on all legs of Hunt Club Rd & Washington St.
- Stage 2 MOT shift