
June 8th Construction Work Update
By: Sierra Vidican
06.08.2026
Please feel free to reach out with any questions you may have.
Ongoing Work
- Install stamped concrete and gravel mulch in center medians on the Washington St east and west of Hunt Club Rd north and south of Washington St.
- Installation of permanent traffic signal posts and mast arms at the intersections of Hunt Club Rd and Washington St & Hunt Club Rd & Orchard Valley Dr.
Upcoming Work
- Permanent landscaping for Stage 2 and Stage 3 along project limits.
- HMA surface removal of existing roadway along project limits in preparation for resurfacing.
- Placement of HMA level binder along project limits following existing surface removal

